Subcontracting material directly to subcontracting vendor

hi all
i created BOM in cs01 for material suppose m for three child materials .these components i procure from a regular vendorA. and give it for subcontracting to vendor C. i am creating a PO  in this at item tab delivery address is of subcontracting vendorC ,SC vend field is ticked and PO is given to vendor A. now when i want to do GR for this material i am getting error that "MATERIAL DATA AND PO DATA DO NOT MATCH"
any help

thanks i got the answer it can be planned via mrp

Similar Messages

  • Sending material from one subcontracting vendor to another vendor

    Hi Experts
    we have a scenario we have more than one subcontracting vendors.so the unused raw material should be send to one vendor to another.so how can we configure it.please give me feedback.
    Thanks in advance...

    Hi Madhu ,
    What do u mean sending unused material from one vendor to another ?
    In subcontracting u can send material to only one vendor at a time.
    Regards
    Ramesh Ch

  • Subcontract vendor settlement

    Hi Gurus,
    The scenario is like this.
    I have maintained a Non stock material as part of the BOM for a finished product which is basically the conversion charges for the finished material.
    when a production order is created for the finished material a Purchase requisition gets generated for the non stock item. after doing the GR for the finished material we convert the PR of the non stock material into purchase order and settle the vendor.
    is there any way we can avoid the whole purchase cycle for the non stock item and directly settle the vendor?
    Note: the non stock material is unique for each finished material and it needs to be a part of the BOM.
    Thanks and Regards
    Mallikarjun Patil

    What you are saying is standard subcontract process. For the header material, in material master mainatin special procurement key 30 and procurement key F. Use same BOM what you have now. Subcontracting PR will be generated for header material. Convert as PO with subcontracting charges (you can maintain info record also)Issue the components using 541. and when the process is done make GR with 101. All issued component will be consumed.
    Regards
    Antony

  • Subcontracting in Production, 2 subcontracting vendors involved

    Hi,
    We have a scenario where in production 4 operations needs to be performed, one of which is a external process [subcontracting]
    Process 1 - Drilling
    Process 2 & 3 - Subcontracting [External process] u2013 2 processes
    Process 4 u2013 Finishing
    After drilling process, material is sent to subcontractor A for cutting, after this is done Vendor A will sent product to Vendor B directly for further operation . Once this is done We receive from Vendor B
    Then it will go to Process 4 [Finishing]
    Can you please help in mapping this scenario in SAP
    If there is only one vendor involved then I believe process will be like one subcontract PR [system creates automatically], we issue goods and we receive finished goods
    In this case Subcontract vendor A sends directly to Vendor B
    Both Vendor A and B sends invoice to US
    Any pointers in this regards will be of great help
    Thanks

    Hi ,
      While raising the subcontracting order for vendor A enter Delivery address vendor B address & save.
    Raise one more P.O(subcontracting ) with vendor B
    when vendor supplied material to vendor do the migo.
    then in sap stock will increase at vendor B.
    when material recieved from vendor B do migo stock will increaes in respective plant.
    you can procees invoice with P.O wise
    Try this one & let me know
    Rgds
    venkat

  • Sale Order Subcontracting & Vendor wise stock

    Dear Gurus,
         I have one doubt we are doing sale order subcontracting transfer posting by 311 E to vendor. so is it really need to create vendor wise storage locations to track the stock at vendor end,  as we have no. of vendors for subcontracting and storage location is part of organization structure.
    so is it advisable to go like that ? or please suggest me any other way to track the stock at vendor end sale order wise.
    Thanks & regards,
    Akshay

    Hello Sir ,
    As it is not possible to send material which are already in special stock (sale order stock ) to subcontractor by 541 movement type , it is recommended to transfer by 311 E my MB1B or MIGO...
    while doing good receipt 101 E and 543 E will going to happen , for 543 E system will automatically ask storage location. i have done already this but there only one subcontractor was there,
    and in this client we have more than 80 subcontractor so i am hesitating to do this....
    Subcontracting for Sales Order Stock and Project Stock - Managing Special Stocks (MM-IM) - SAP Library
    Sale Order Subcontracting & Vendor wise stock 

  • Overhead on Subcontract Vendor Charge

    We have implemented Raw Material Costing, adding overhead through use of a costing sheet.
    We use subcontracting (PrcTypF/SpcPrcTyp 30). In most plants it is a minor portion of the cost, so we did not need to know how to add overhead to the vendor charge
    At One of the plants that we are converting now to Raw Material costing, the Subcontract vendor charge is 80 - 90% of the value. We need overhead added to that charge.
    I thought I could just check the box in the valuation variant for Overhead on Subcontract Materials and it would calculate.
    It did not..
    I did add the subcontract cost element to the BASE on the costing sheet.
    What else do I need to do to get the overhead
    thank you
    Althea

    Have you specified OH costing sheet under the tab overhead? This costing sheet needs to be specified for the Finished/semi finished field.
    Please check if you can see the OH sheet under the valuation tab. Also check if the cost element in OH costing base is showing in itemization.
    I think it is a OH costing sheet issue and not subcontracted material issue.
    Sanjay Wagh

  • Subcontracting Vendor and Purchase Vendor

    Dear All,
    I have created separate Pricing Procedure for Subcontracting PO, since the requirement is to calculate the price on issuing qty. I have put Formula Based Condition type.
    We issue 100 KG of material and receive less than 10 KG (say 90-95 KG) but the vendor charges for issuing qty (100 KG)...so I created a new condition type which calculates for total price for 100 KG and calculates for receiving qty...Suppose Rs. 10/KG then in this case its Rs.1000/- but system should calculate unit price for 90 KG i.e. 1000/90 = 11.11 ...this is working fine as long as Iam calling Subcontract Vendor where this Schema Group is assigned in the Vendor Master..
    My problem is, for some Vendors, he is both Subcontracting Vendor and Purchase Vendor...so Iam not able to calculate for Subcontracting calculation with this requirement...where as I have separate calculation schema for Purchase Vendors...
    How to meet this..
    Kindly Suggest
    Regards,
    Gopala.S

    Hi
    Thanks for your quick reply, please give me some brief info on routine, how and where we need to do settings.
    Regards,
    Gopala.s

  • Ordering components to subcontracting vendor

    Hello gurus,
    We have a scenario where we are manufacturing one product at our subcontracting vendor. The assembly contains materials we are sending to our SC vendor stock from our company (with ME2O), but it also contains materials, which are ordered directly to the stock with subcontractor from another vendor. Now when we are creating Purchase order for this kind of component, we have to fill in subcontractor's vendor number and tick the "SC vend" box (delivery address tab) every time.
    Is it somehow possible to have this SC vendor's number and SC vend box already marked in Purch. req. (which MRP run creates)?

    That's what I was afraid of.. Thanks for the info. That same component is used also in other products which are not manufactured at subcontractors location, so I need also a logic to find out which purchase requests were generated by SubReqs.

  • Intra company stock transport order with delivery to subcontracting vendor

    Hi Friends,
    We have an issue with Intra company stock transport scheduling agreement with delivery to subcontracting vendor.
    We have a scenario where the component is provided by another plant (Plant A -Intra company) directly to subcontracting vendor and the subcontracting vendor processes the component and sends us(
    Plant B) the finished good.
    We have a subcontracting scheduling agreement created with the subcontracting vendor with Item category u201CLu201D for plant B .(Document type LPA)
    And we created the stock transport scheduling agreement with document type LU (Between Plant A to Plant B) by entering the subcontracting vendor number to the "EMLIF- Vendor to be supplied/who is to receive delivery" field but the check box "LBLKZ-Subcontracting vendor" is hidden in the delivery address tab.
    Field selection with document type (LU) and Field selection with transaction code (ME37) did not help to bring the field to the delivery address tab.
    As a result, when we do PGI from the supplying plant, the stock is posted to "in transit" (Movement type 641) instead of "Component provided to vendor" (Movement type 641 u2013 O)
    The same behavior for purchase order with document type UB as well/
    Is the movement type u201C641-O u201C supported by standard SAP or do we have any other workaround to address the requirement. ?
    Now we are in ECC 6.0 EHP3.
    Your inputs will be highly appreciated.
    Regards
    Gobinathan G

    Hello,
    This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
    Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
    By "two steps" I mean:
    1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
    2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
    Thanks and regards,
    Stéphane

  • Error : T161W: Vendor+subcontracting vendor not allowed for 2-step stock tr

    Hi Gurus,
    When we creating a STO to sub contractor vendor ( in the delivery address tab we are entering the vendor # and activating the SC vendor check box)we are getting the error message as "T161W: Vendor+subcontracting vendor not allowed for 2-step stock transfer".
    Message no: MEPO140
    Note:
    The STO is creating with out error in ECC 5.0 for the above scenario but when i'm  trying  the same in ECC 6.0 in another system I'm getting this error, Can any one please advice.
    Thanks in advance,
    Sai

    Hi Charlie
    I had same issue and we sloved it. but i have one more issue here.
    We have created Po and SC Vendor is not check marked. When we go into the change mode of Po i can't see the field at all. but its availalbe in disply mode.
    I am using ECC 6.0, Please suggest why this is happening. I need to put check mark for SC vendor.
    thanks,
    Raju

  • Sell material directly to Vendor????

    My requirement is  We would like to sell material directly from vendor, I mean I would like to buy it of course, but to deliver it directly from my vendor to my customer. Do you have any concept how to handle the situation, cause in normal way I should have goods receipt, goods issue, and of course invoice postings, etc.

    In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    The processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally, can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.

  • Direct delivery between vendors

    We have a requirement here, that is, Vendor 1 will supply material to Vendor 2 directly. Vendor 2 is a sub-contractor to us and will use this material to assemble another material and send it to us on a different PO.
    After the material is received by vendor 2, he needs to acknowledge the receipt of the material on the vendor 1 invoice and also confirm the quality of the same. Based on the receipt of these papers, GR will be made at our end (Dummy GR - no Qty update). We will not avail Excise but Vendor 2 will avail the excise for this material. VAT / CST needs to be captured during GR.
    Subsequently, Payment to vendor 1 will be released based on the GR and a commercial invoice needs to get generated on Vendor 2, who will be treated as a customer also in SAP. The Excise amount needs to be merged with the material price in the commercial invoice.
    Pl suggest if u are also operating on such scenario or anything equivalent.

    Thanks a lot for the reply team,
    We are using the SC vendor process for other vendors . But, here we have a small difference in using SC vendor scenario or the third party scenario. The hurdle in using SC vendor scearios is that we have to monitor and do the re-concilliation at the vendor end. This material though being small in size has a prominent importance in output assembly from vendor 2. So, we want to procure it from vendor 1 and sell it to vendor 2. But, this becomes a trading business for which Excise dept will raise an objection. Also, the normal process of procurement should not be changed else there will be a confusion during GR creation when we use third party scenario ie., SA creation - MRP run - Schedule updation - ASN creation thru portal - GR - Payment thru MRRL etc..
    This being a regular supply it will be difficult to create many POs each time, if we use the third party process.
    Pl commnet.
    regards,
    Vinayaka

  • Importing the material directly to Depot through Import PO

    Hello,
    We are Importing the material directly to Depot.
    We are directly procuring material  to Depot through Import PO.
    We are creating the Import PO from Depot with Inventrising Conditions , then we will go for MIRO for Customs,
    We are cleared the Customs through MIRO
    While GO for MIGO to Create RG23D entry, system is not Popup the Commercial Inv no ,so in MIGO we are not getting any duties.
    Plz can you suggest how to go for Import the materail in Depot with Import PO.
    Regards
    Sapman man

    Hello,
    Plz can elobaorate the things...... we are procuring the materil for DEPOT from Import vendor....
    How to do this scenario??
    regards
    sapman man

  • Material Procurement from many vendors

    Hi friends,
    I am working in a process industry where raw material is supplied from nearly two thousand vendors.I put all vendors in a source list. I want to create purchase requisitions at a time for all vendors for same material. How can I create it?
    Please guide me.

    Hi,
    For this you need to follow the "Quota Arrangement" Process.
    Go to MM02 - In "Purchasing" view, enter "Quota arr. usage" as '4" and save.
    Also maintain MRP views of the material master.
    Now go to OMI4 - here for MRP Lot Size (For e.g. EX), activate "Splitting Quota" for Short-term as well as Long-term planning both and save.
    Now go to MEQ1 - here for material master and plant and press enter, here maintain valid to date and pres enter and double click on this
    Here enter Procurement as "F" (External Procurement), also enter all the vendors and enter Quota as "1" for all the vendors.
    Prerequisite for Quota Arrangement is Purchase Info Record and Source List must exist for the material.
    Now maintain Planned independent requirement for material in MD61 and then run MRP for the material in MD02 and check system will generate the PRs for the material for all the vendors maintained in MEQ1.

  • Effect of issuing Material directly from Interim Storage BIN?

    Dear Experts,
    What is effect of issuing(311) material directly from Interim storage BIN without storing to Storage BIN.
    Because i am unable to do LB11& LB12  for  both GR's(101) and TP(311) as it has directly picked from Interim Storage BIn to do
    TP(311).
    So please someone explain me the effect of the above Scenario?
    Thanks & Regards,
    Olet Malla

    You can do it but in general you should not allow picking from interim Storage Types.  For example you don't want Sales trying to pick materials sat in the PSAs, you don't want Production trying to pick from materials in 916 etc. etc.

  • To receive material directly into  warehouse with out creating TO

    Hi all,
    Iam  having  a  requirement in warehouse-   I   want  to  recive the material  directly  in to  warehouse   against  a PO with out  creating any Transfer order.
    I want to  know what are all the setups  we  need to  maintain.
    Thanks in advance
    Venkatesh.

    Dear Venkatesh
    please understand the client requirement ,
    if you want to receipt the good against PO, material post in to inventory management then to warehouse management ,
    try this in order to create Automatic TO & Confirm the same
    Implementation Guide for R/3 Customizing (IMG)>Logistics Execution>Warehouse Management>Activities>Define Movement Types
    in movement type 101 please check the setting  under background processing & confirmation for automatic TO creation as well as The transfer order item may be confirmed immediately

Maybe you are looking for